Untitled Document
 
 
Untitled Document
EDI will be attending the following
Conferences and Trade Shows
January 28 – 30, 2008
TechCon 2008 TJ/H2B Chateau Elan Winery
and Resort
Braselton , Georgia
   
February 11-12, 2008
ABB School of Maintenance Transformer Monitoring Technologies Johannesburg South Africa
   
March 2008
Doble Users Conference
Boston MA
   
April 21, 22, 23 2008
IEEE Transmission and Distribution
Chicago, IL
   
 

Continuous Bushing and Winding Distortion Monitor - BHWM

Brochure and Specifications

  • Continuously monitors the bushing power factor and capacitance
  • Continuously monitors for winding distortion using leakage reactance
  • Stores up to 5 years of data
  • Up to two sets of Bushings (6 bushing total)
  • RS 485 ModBus RTU communications interface
  • OEM and End User versions available
  • Uses Standard Bushing Sensors

Bushings represent one of the highest failure components on large power transformers. It has become apparent that defects in bushing can occur very quickly and periodic testing of bushings in these cases is ineffective. This combined with the fact that many defects do not show up at offline testing voltages (10kV) and some defects are temperature sensitive, makes this monitor an ideal complement to any transformer monitoring package.

Another significant problem is the mechanical stability of the winding and the ability to withstand tremendous mechanical forces due to short circuit currents. If a winding mechanical support system is loose, the next high peak current associated with a short circuit somewhere in the system may cause mechanical winding deformation and causing a major insulation failure. Timely detection of a deformed winding may avoid a catastrophic failure.

The (BHWM) is designed to monitor both the C1 Capacitance and Power Factor of each individual bushing and winding distortion. The BHWM has unique features unlike any other busing monitor that is available today. Measurement of the power factor and capacitance is based on the common "Sum of Currents Method" algorithms. Winding distortion is monitored by estimating the change in transformer leakage reactance.

Acoustical Partial Discharge Analyzer AR-700
Acoustical Partial Discharge Analyzer AR-700
OEM Version
End User Version with Optional Display
Home    |    Site Map    |    Contact Us
© 2007 All rights reserved.